CLOSED: This survey has concluded.
Mission Creek playground play structure renewal
Due to the timber playground structure’s age, condition, and ability to continue to meet safety requirements in an effective manner it is scheduled to be replaced in 2024. A similar structure would include slides, raised walkways, monkey bars and interactive play panels.
The purpose of this survey is to gather feedback on the replacement of the timber playground.
Thank you for your thoughtful feedback!